Private  

Newport Road & Berea Road Improvement Plans -
County of Riverside

 
Public Works  

 

The County of Riverside Transportation Department contracted with K&A Engineering, Inc. to prepare the improvement plans for the completion of Newport Road from Murrieta Road to Goetz Road. This 2 mile section of Arterial Highway was the critical missing link for traffic circulation in the Menifee/Canyon Lake area of Riverside County. A portion of the improvements were constructed by others several years before but was never opened to traffic.

K&A Engineering, Inc. was responsible for defining the improvements required to open the roadway to traffic, designing the improvements, and preparing the improvement plans. The design included AC pavement, AC overlays, curb and gutter, traffic striping and signage, catch basins and reinforced concrete drain pipe, as well as many incidental improvements.

K&A’s Survey Department prepared 22 legal descriptions for the project to be used for the preparation of Easements at the request of the County. And K&A Survey Crews provided the needed field survey for the project.

The County of Riverside placed the project on a “fast track” by the County and K&A Engineering completed and delivered the project design on schedule.